Case Study - Cooling Towers - Internal & External BAC Relining

Project Brief: The Internal and External Relining of 2 No. BAC Cooling Towers

System Specification: Solvent Free Polyurethane

Completion Date: 25th January 2007

COVAC Contract Ref: 574

Summary of Works

All internals of the towers were previously coated with Baltibond. This coating had reached the end of its useful life due to sub-film corrosion, poor elongation properties and subsequent de-bonding. The externals of the towers were painted with aerosol paint, which had reached the end of its useful life due to excessive sub-film corrosion, low film build and general deterioration.

2 No. Cooling Towers - Internal

water tank before treatment water tank before treatment water tank before treatment water tank before treatment water tank before treatment water tank before treatment water tank before treatment water tank before treatment

The internal substrate of the 2 No. Towers prior to any preparation work involved in removing all of the existing failed non flexible epoxy coating.

water tank before treatment water tank before treatment

On initial inspection severe corrosion was found to be apparent on numerous components, which were removed and subsequently replaced once the coating process had been completed.

water tank before treatment water tank before treatment

All internal surfaces were prepared in accordance with Swedish Standard SA 2.5 BS7079 Part A1 1989, utilizing mechanical, abrasive blasting and manual tools to raise a minimum surface profile and removing all surface scale and corrosion.

water tank during coating water tank before treatment

Any exposed or protruding rubber jointing strips were cut back to the substrate. All joints were then filled utilizing a flexible polyurethane mastic / sealant.

water tank during coating water tank during coating water tank before treatment water tank before treatment water tank during coating water tank during coating

The finished coat of Solvent Free Polyurethane has been Spray applied.

2 No. Cooling Towers - External

water tank before treatment water tank before treatment water tank before treatment water tank before treatment

The external substrate of the towers and surrounding associated steel work, prior to the preparation work involving the removal all of the existing failed epoxy Baltibond coating

water tank before treatmentwater tank before treatment

All steel work and external surfaces were dry abrasive blasted in accordance with Swedish Standard SA 2.5 BS7079 Part A1 1989, utilizing mechanical and manual tools to achieve the optimum surface adherence.

water tank before treatment water tank before treatment

the externals of the cooling towers together with the associated steel works having received the final coat of Solvent free Polyurethane.

water tank before treatment water tank before treatment water tank before treatmentwater tank before treatment

On completion of our full scope of works, BAC Balticare replaced all new fan housing’s and components, which were subsequently recoated externally by Covac Site Operatives.