Call Us Today

0800 772 3367

Acothane DW Nationwide Water Tank Services

Case Study - Calorifiers

Client: Sports Centre

Project Brief: The Internal Relining of 2 No. Steel, Cylindrical, Calorifiers

System Specification: Solvent Free Polyurethane

Completion Date: 9th September 2008

COVAC Contract Ref: 761

Summary of Works

2 No. steel, horizontal, cylindrical, calorifiers located in a plant room and sized at approximately 13’ x 5’ diameter.

2 No. Steel, Cylindrical Calorifiers

corroded water tank before treatment corroded water tank before treatment

The vessels show signs of progressive surface corrosion.

corroded water tank before treatment corroded water tank before treatment water tank cleanedwater tank prepared and stripe coated water tank prepared and stripe coated water tank prepared and stripe coated

The internal surfaces are prepared by COVAC Operatives using dry abrasive grit blast equipment in accordance with the accepted Standard.

water tank before treatment water tank before treatment

The substrate of the tanks having receive the 1st full coat of Solvent Free Polyurethane (cream).

water tank before treatment water tank before treatment

Vessels receive the final application of the 2nd coat of solvent free Polyurethane (grey).

water tank before treatment water tank before treatment water tank before treatment water tank before treatment water tank before treatment water tank before treatment

The vessels hatches fully relined utilising solvent free Polyurethane coating.

Call us today find out why you should use our alternative to water tank replacement on: 0800 772 3367.