Call Us Today

0800 772 3367

Acothane DW Nationwide Water Tank Services

Case Study - Plastic Tanks (GRP) 2

Client: Conference Centre

Project Brief: The Internal Coating of 1 No. Sectional, Split, GRP CWS Tank – 2 No. Compartments.

System Specification: Solvent Free Polyurethane

Completion Date: May 2011

COVAC Contract Ref: 1061

water tank before treatment water tank before treatment water tank before treatment water tank before treatment

The internal surfaces of the Compartments having been drained of water, but prior to any work commencing.

water tank before treatment water tank before treatment

All internal surfaces were abraded utilizing a combination of both manual and mechanical tools in order to raise a suitable surface profile on the substrate and promote optimum adherence of solvent free polyurethane lining system.

Where possible all fastening were sufficiently torque and existing mastic cut back, prior to all jointed areas being coated with Trowel Grade Polyurethane in conjunction with fibreglass webbing.

water tank before treatment water tank before treatment water tank before treatment water tank before treatment

The substrates having receive the 1st full coat of Solvent Free Polyurethane (cream), by means of brush and roller.

water tank before treatment water tank before treatment

The following images show the final application of solvent free polyurethane (grey).

Call us today find out why you should use our alternative to water tank replacement on: 0800 772 3367.