Calorifier Relining Case Study
Client: Sports Stadium
Project Brief: The Internal Relining of 2 No. Steel, Cylindrical, Calorifiers
System Specification: Acothane DW Solvent Free Polyurethane
Completion Date: 2008
Guarantee: 10 Years
COVAC Contract Ref: 761
Relining Steel Calorifiers at a Sports Stadium
2 No. steel, horizontal, cylindrical, calorifiers located in a plant room and sized at approximately 13’ x 5’ diameter. The steel calorifiers were showing signs of corrosion and the Client required a long term, guaranteed solution.
COVAC prepared and relined the calorifiers, a ten year guarantee was issued to the Client with an option to extend the guarantee after ten years.