Client: Supermarket Distribution Centre
Project Brief: The Internal Preparation & Coating of 1 No BAC Cooling Tower
System Specification: Acothane DW Solvent Free Polyurethane
Completion Date: 2018
Guarantee: 10 Years
COVAC Contract Ref: 1566

Summary Of Works

Cooling Tower - Case Study

1 No. BAC Cooling Tower sized at approximately 5.4m x 3.6m x 2.5m up to condenser tubes and 5.4m x 3.6m x 5m the complete tower.

The cooling tower is located externally at high level and had previously been electrostatically coated with a dry, polymetric hybrid thermosetting powder which had been fuse bonded to the substrate. Attempts had been made by others to fibreglass line the internal of the tower sumps in order to prevent leaking from the tower joints, which had failed as the tower was still leaking. Osmotic blistering was present on the existing coating and there were visible leaks from the corroded tower joints underneath.

Request Your Free Commercial Quote

Whether you need a full water tank relining, a comprehensive inspection, or advice on WRAS & DWI compliance, our technical specialists are ready to help. Fill in the quick form below to receive a fast, accurate quotation or request a site survey.

Contact Us
Get In Touch With Your Local Office
For more information on our services, call us on 0800 772 3367 today!

Testimonials

  • construction line
  • british automatic fire sprinkler association logo
  • chas
  • achilles
  • safe contractor approved
  • UKAS ISO 14001

    Cert No. 22946

  • UKAS ISO 14001

    Cert No. 22946