
Hot Well Tanks
Client: Research and Consultancy Group
Project Brief: The Internal Relining of 1 No. Hotwell Tank
System Specification: Acothane DW Solvent Free Polyurethane
Completion Date: 2015
Guarantee: 10 Years
COVAC Contract Ref: 1421
Hot Well Tanks - Case Study
1 No. welded mild steel Hot Well tank sized at approximately 2.4m x 1.2m x 1.5m and located on a high level platform in a plant room.
The tank was previously internally lined in 2007 with an unknown coating and was showing signs of corrosion, deterioration and leaking. The Client now required a long term, guaranteed solution. COVAC prepared, repaired and relined the Hot Well tank then issued a ten year guarantee with an option to extend the guarantee after ten years.
Request Your Free Commercial Quote
Whether you need a full water tank relining, a comprehensive inspection, or advice on WRAS & DWI compliance, our technical specialists are ready to help. Fill in the quick form below to receive a fast, accurate quotation or request a site survey.
-
Cert No. 22946
-
Cert No. 22946

